33 - Baggage Area storage bins and access panels riveted
Prior to priming the baggage area parts, I had considered working on the rear baggage bulkhead, but decided it was better to continue this after baggage floors were riveted in place. Therefore other than deburring the edges of these bulkheads, I then put them aside. Baggage bulkheads deburred and set aside for revisiting at a later time Next I primed all the finished baggage area pieces, and began riveting them together. Baggage area parts labeled and primed Storage bins and rear seat floors primed Baggage floors primed I started by riveting together the storage bins following the Sky Design plans. These went together very easily, mostly with the pneumatic squeezer. Storage bin parts laid out for riveting. I decided to prime the interior of the bins with Kirker 2K EnduroPrime for additional durability and strength Hinges were riveted to the interior of the bins first, followed by the bin corners and the lid latches Storage bin riveting complete. I did file down the notches f...