Build Modifications

This being my first (and maybe only) airplane build, for the most part will be sticking to the plans. My goal is to only deviate from the plans when a modification

  • improves safety and/or
  • reduces cockpit workload and/or
  • makes the build process somewhat easier 
There is a whole industry around third modifications available for the Van's RV-10 and I have spent (and will continue to spend) a lot of time reviewing all the available options. If something fits into one or more of the above criteria I will consider adding it to my RV-10 build. Of course, reading about other builders' experiences adding the modifications also gives me a lot of insight into whether a modification is worth doing, so I am very grateful to those builder's that share these details in their build logs.

Following is a list of modifications that I have done so far, as well as those I've committed to doing. This list will be updated as needed.

Empennage

Elevators

  • IFlyRV10 Billet Trim Brackets - [build logs] - Purchased to replace the welded WD-415 anchor brackets provided in the empennage kit. The machined aluminum brackets look much nicer, add only a few grams weight compared to the welded brackets, and I've heard that some welds have failed in the past so I feel more secure with the single piece aluminum brackets.
           Kit change: DELETE 2 of WD-415

Tail Cone

  • Avery Rudder Cable Fairings - [build logs] - Van's does not supply any rudder cable fairings for the cables that exit the tail cone. These are fairings that a number of builders have used, and with some trimming and prep work will provide a nice finished look. 

Wings

           Kit change: DELETE W-1015-L Left wing tip
                                DELETE W-1015-R Right Wing Tip
                                DELETE W-1016-L Left Wing Tip Rib
                                DELETE W-1016-R Right Wing Tip Rib
                                DELETE VA-193 Wing Tip Lens

Fuselage

           Kit change: DELETE VENT TG-1010 L&R RV-10 Heat Boxes
  • Andair FS2020 Duplex Fuel Valve - ordered EFS2020-D2-TMT on March 16, 2023 with 4 elbow (EF20) and 2 straight (MF20) fittings, and a 6" extension with countersunk mounting holes

           Kit change: DELETE BAG 487-1 RV-10 Fuel Valve 
                    - unfortunately as of 2/2023 Van's no longer allows hardware bag deletions from kit orders so 
                      BAG 487-1 cannot be deleted

               Kit change: DELETE 2 of F-1052 Brake Pedal Set 
                                    DELETE 2 of F-1052B Brake Pedal Side Plate
                                    DELETE 2 of F-1052C Brake Pedal Doubler Plate
                                    DELETE BAG 665 -  F-6115 Rudder Pedal Bearing Block (center)
                                        - unfortunately as of 2/2023 Van's no longer allows hardware bag deletions from 
                                           kit orders so BAG 665 cannot be deleted
                                    DELETE WD-1006-R-PC Right Rudder Pedal 
                                    DELETE WD-1006-L-PC Left Rudder Pedal 

                 Kit change: DELETE F-8105 Brake Hoses 
                                      DELETE PT062X1/4 Tubing
                                      DELETE BAG 1377-1 Hardware
                                          - unfortunately as of 2/2023 Van's no longer allows hardware bag deletions from 
                                             kit orders so BAG 1377-1 cannot be deleted
                                      DELETE AT0-032X1/4X12 Tubing

                       Kit change: DELETE 1 of F-1048D (for wing root filter kit) 
                                                - unfortunately as of 2/2023 Van's no longer allows hardware bag deletions from 
                                                   kit orders, and F-1048D is part of a hardware bag so cannot be deleted
                                            DELETE VA-188 (for wing root filter kit)
                                                - unfortunately as of 2/2023 Van's no longer allows hardware bag deletions from 
                                                  kit orders, and VA-188 is part of a hardware bag so cannot be deleted
                                            DELETE AT0-035X3/8X12' Tubing

                             Kit change: DELETE C-1004-L Rear Left Window 
                                                  DELETE C-1004-R Rear Right Window 
                                                  DELETE C-1005 Windshield

                  • Additional materials added to fuselage kit

                               Kit change: ADD 1 of AA6-063X3/4X3/4X6' 3/4" x 3/4" x 1/16" x 6ft Aluminum Angle 
                                                    ADD 1 of AA6-125X1X1X6' 1" x 1" x 1/8" x 6ft Aluminum Angle
                                                    ADD 1 of AA6-125X3/4X3/4X6' 3/4" x 3/4" x 1/8" x 6ft Aluminum Angle
                                                    ADD 1 of AA6-125X1X1-1/4X5' 1" x 1-1/4" x 1/8" x 5ft Aluminum Angle
                                                    ADD 1 of AN257-P4X6' 6ft Hinge 
                                                    ADD 1 of AN257-P3X6' 6ft Hinge

                        Finishing