Empennage Attach 11-6-3 to 11-6-4
The aft elevator push rod is assembled in the empennage attach section of the plans, and as I was working on other push rod assemblies I also took care of this one at the same time.
![]() |
| 3D printed drill guide being used to match drill holes through the push rod into the push rod ends |
After deburring and priming all push rod parts, I riveted the rod ends in place with MSP-42 rivets, attached bearings and adjusted them for the approximate length given in the plans. I then set the push rod aside for future installation into the tail cone.
![]() |
| Push rod end riveted and bearing attached |
![]() |
| Everything looks good at both ends for installation in the tail cone |
Dates: December 13 2025, January 18 2026, February 19 2026


