Finishing up the remaining riveting from the firewall section of the plans, I finished riveting the rudder pedal support bracket to the firewall recess. These are tricky due to limited space within the recess for the rivet gun, but I was able to set all rivets using a 1" offset mushroom set.
![]() |
| The rivet in the top corner of the recess was the hardest to set, but I taped some wood blocks to the recess to help prevent the mushroom set from wandering while running the rivet gun |
![]() |
| With easy access to the rivet tails, shop heads formed well |
With this step taken care of, I'm calling the firewall section complete. I will still have to attach the stainless steel heat vents, but I'll do that later as I add additional components to the firewall.
Time Taken: 0.3 hours
Dates: October 15 2025
Firewall Total Time: 51.3 hours
RV-10 Build Total Time: 1197.2 hours